LINK 51 manufactures industrial racking systems from a large factory in Telford.

The factory is heated by a number of warm air blowers and radiant tube heaters, with an annual heating gas consumption in excess of £40,000.

Obviously effective control of the heating was important to them as gas prices were starting to escalate, so in the Autumn of 2004 they asked Clarke Controls to install an energy management system to make some savings.

Prior to installing the system, Clarke's guaranteed to make reductions of 20%, however there was some degree of scepticism about the level of savings we were guaranteeing as they already had a basic energy management system in place.


After analysing the gas consumption it was found that the Clarke's energy management system had ACTUALLY saved over £19,000 in the first 12 months - more than double the guarantee.


The customer was very happy indeed!

Gas consumption
prior to installation
  Gas consumption
after installation
Month KWH   Month KWH
June 03 520,348   June 05 346,117
May 03 536,862   May 05 558,242
April 03 649,953   April 05 688,482
March 03 980,288   March 05 733,791
February 03 1,008,658   February 05 897,501
January 03 873,295   January 05 993,343
December 02 908,280   December 04 477,061
November 02 1,141,878   November 04 606,100

After taking into consideration the gas used in the paint drying process, there was a reduction of 46.05% in heating gas and a saving of £19,161